New hall in Boskovice completed

18. 11. 2021

If you have visited us this year, you may have noticed the lively traffic on the construction site in our Boskovice compound. A new hall has been under construction here since April, as part of our project to increase storage and production capacities.

Now everything is ready and the warehouse with an area of 3,000 m2 and a semi-automated operation can start to load stocks. It is intended primarily for components that have a risky delivery time in order to prevent production downtime and make better delivery times available to our customers.

November 2021
November 2021
February 2021
February 2021

Gallery

Latest news

A new Flexi Lounge model

The Flexi Lounge series now includes a new model, which already attracted a lot of attention when it was launched at ORGATEC in autumn.  The new Flexi Lounge armchair combines minimalist design with remarkable comfort. Its ergonomic shell using soft injected polyurethane foam – 10cm in the seat...

Expansion of the Riva series

The Riva series is popular because of its modern design, versatility and comfort. These chairs with plastic or upholstered shells and different kinds of bases are perfect for a wide variety of interiors, ranging from meeting rooms to lounges. We have now added new versions to this series, which...

window.onload = function () { document.querySelectorAll("section.tiny-mce-content img") .forEach(image => { if (image.alt) { image.classList.add('tiny-mce-image') image.style.marginBottom = '.5rem' var description = document.createElement('span') description.class = 'tiny-mce-image-caption' description.style = 'color: #888; margin-bottom: 2rem;' description.innerHTML = image.alt insertAfter(description, image) } }); } function insertAfter(newNode, existingNode) { existingNode.parentNode.insertBefore(newNode, existingNode.nextSibling); }